Mappi MTH Monolith

Mappi MTH Monolith
Photo source
Mappi International

Date: 9 December 2022

MTH, the furnace designed for those who have to manage large load volumes and process very large slabs without sacrificing Quality, Flexibility, Energy Savings.

MTH has a maximum load floor of 3300 x 6000 mm, a true “giant”. Such a large furnace demonstrates even more what it means to have the exclusive Mappi solutions that allow you to obtain excellent results and the maximum optimization of energy.

Last but not least new MTH is really beautiful, its angular lines, highlighted by LED lights, have a charm that had never before been seen in glassworks.

600450 Mappi MTH Monolith glassonweb.com

Others also read

Thermoseal Group’s Sales Director, Mark Hickox, explains why having an in-house lab is vital to the component manufacturer’s success.
Glasstech Asia & Fenestration Asia 2025 is just months away, and the official visitor pre-registration will open soon.
After a six-year break, the LiSEC Technology Days took place again in Bad Arolsen, Germany, on 25th and 26th June 2025.
From June 12 to 14, the CMS facility in Zogno (BG) hosted the CMS Open House – three days dedicated to innovation in glass processing, featuring live demonstrations, technical insights, and valuable meetings with customers and partners.
From July 16 to 18, 2025, Pujol & Evalam, together with Herralum, will take center stage at Glasstech Mexico (booth G03) in Mexico City’s Centro Citibanamex.
The new TPS® PRO technology represents the most efficient and flexible solution for insulating glass manufacturing.

Add new comment

From industry

Polígono Industrial El Bayo, parcela I, 19
24492 Cubillos del Sil León
Spain

NEWS RELATED PRODUCTS

Glaston Corporation
Glaston Corporation