The Problems of Laminating Glass with EVA FILM

The Problems of Laminating Glass with EVA FILM By Peter Shin I have talked about the Bubbles Solution for Laminated Class with EVA Film , and today I would like to talk about the other problems you may face in laminating glass with EVA FILM.

The common problems are: degumming and self-exposing of the laminated glass.

Degumming: 1) The heating temperature is not high enough or the keeping time is not long enough for the EVA FILM to melt and react totally, like the cross link reaction is not finished. For this reason, please increase the heating temperature or the keeping time of laminating.

2) The EVA FILM is out of the shelf life, most EVA FILM’s self life is about one year or longer. Please use the EVA FILM within the self life. Yes, different EVA FILM manufacturers may have different self life for the EVA Film.

3. Maybe it’s the problem of the quality of the EVA FILM. Send some film samples for the EVA FILM manufacturer to test the EVA FILM again.

Self-Exposing

1) The laminated glass is cooling too fast. Please do not open the oven door to help cooling after the temperature of the laminated glass is lower than 75 degrees.

2) Please avoid the hot laminated glass touching the cold water.

3) Put some wood blocks between the laminated glasses to make the cooling is well-proportioned.

Hope all those info may be helpful to you.

All rights reserved by EVA FILM BLOG: www.evafilms.com

600450 The Problems of Laminating Glass with EVA FILM glassonweb.com

See more news about:

Others also read

For successfully process extra Jumbo size, the Coupling Press has been upgraded with many new features to ensure high processing quality. 
“Creating space – opening worlds”
“FeneVision has exceeded our expectations.” Mélanie Mercier, Laurier Glass
How Suntuitive® Dynamic Glass was implemented at the University of New Mexico Anderson School’s new McKinnon Center for Management
FGS was commissioned to design, manufacture and install The Macallan distillery’s new glass façade.
As part of our ongoing partnership and the continuous development, Granada Secondary Glazing has completed another project for Leeds University to decrease heat loss.

From industry

40 Corniche El-Nil,
Al Sharafain Tower Maadi,
Cairo Governorate
11728
Egypt

Is Kuleleri, Kule: 2, Kat: 22, 4. Levent
34330 Levent-Istanbul/İstanbul
Turkey

No. 160 Yichuan Rd.,
Jiaonan Shi
Qingdao Shi
Shandong Sheng, 266000
China

Polígono Industrial El Bayo, parcela I, 19
24492 Cubillos del Sil León
Spain

Add new comment