THINK BIG - DO BIGGER / Installation & Setup of Glaston JUMBO XXL 3360 in 90 seconds

THINK BIG - DO BIGGER / Installation & Setup of Glaston JUMBO XXL 3360 in 90 seconds
Photo source
Glaston Corporation

Date: 12 August 2021

Installation & setup of the brand new insulating glass line "Glaston JUMBO XXL FLEX 3360" at AGC Interpane site in Plattling, Germany.

Highlights of this Glaston line:

  • Production of huge & heavy 4-sided stepped insulated glass units
  • Max. processing dimensions 3,30 x 6,00m
  • Box and flex spacer processable

Equipment:

  • 3x GoPro Hero9 on permanent power
  • Timelapse interval: 5 min
  • Duration: 5 weeks
  • Photos: 3x ca. 9,500 pics
600450 THINK BIG - DO BIGGER / Installation & Setup of Glaston JUMBO XXL 3360 in 90 seconds glassonweb.com

Others also read

Discover the Glaston MUNTIN'MASTER with Cobot, a fully automated solution designed to streamline muntin bar positioning in TPS® IGUs.
On 17 September, Glass for Europe, in collaboration with Glass Alliance Europe, organised a visit for a delegation from the European Commission to AGC Glass Europe’s float glass plant in Moustier, Belgium.
As demand for high-performance glass grows, processors face mounting pressure to increase output, reduce costs and manage an ever-wider product mix.
Automation streamlines production of oversized architectural glass
Dr. Stephen Morse of Michigan Technological University shares first-look results on vacuum insulated glass (VIG) durability at the FGIA Fall Conference.
The future of glass processing is automated and starts now

Add new comment

From industry

13- 121, 507 Teheran-ro
Gangnam-gu
Seoul
06169
South Korea

Via per Monastier, 4
31056 Vallio di Roncade TV
Italy

Polígono Industrial El Bayo, parcela I, 19
24492 Cubillos del Sil León
Spain

NEWS RELATED PRODUCTS

Tvitec | Cricursa
Sparklike Oy – Your IG Quality Assurance
Vitro Architectural Glass