The large glass that covers the €1 billion R&D Centre

The large glass that covers the €1 billion R&D Centre
Photo source
tvitecglass.com

Date: 20 January 2022

Tvitec’s large-scale solutions light up AstraZeneca’s magnificent Discovery Centre designed by Herzog & de Meuron.

They say little has been spared in the construction of AstraZeneca’s new Discovery Centre in Cambridge (UK). It will be one of the three largest research centres of the Anglo-Swedish pharmaceutical company. Its grand opening was presided over by Prince Charles, accompanied by AstraZeneca’s executive director, Pascal Soriot, and its president, Leif Johansson. The Swiss architects Herzog & De Meuron have come up with a breath-taking design.

Tvitec oversized glass

Of course, this is in line with the £1.1 billion total investment. The building is covered with a gigantic glass structure, with eye-catching saw teeth of almost 7 meters each covering the 16 laboratories in which more than 2,200 scientists will work. But where have these spectacular pieces of glazing been manufactured so that the aesthetic results also benefit from the insulation, energy-saving, and safety sought by its backers?

The answer, of course, is one of the world’s leading specialists in large-scale jumbo glass manufacturing: Tvitec. Tvitec manufactured each and every one of the nearly 300 triple glazing laminate units surrounding the Discovery Centre, the UK’s largest scientific laboratory.

Tvitec triple glazing for a great ecoefficiency

The triple glazing, which includes smart solar control layers of AGC Ipasol Shine and Iplus Top, along with Guardian extraclear, allows natural light to bathe the entire building organically.  It’s part of the eco-efficiency and sustainability concept of a project in which heat is collected from the ground and its toilets are flushed with rainwater.

Tvitec’s technology for processing insulating glass was combined with the expertise of its professionals to achieve maximum precision in the triangular shapes of many of the zig-zag pieces designed by Herzog & de Meuron. The main body of the AstraZeneca campus sits on six rectangular glass boxes grouped into three pairs. The result is an open courtyard formation, which references the historic universities of Cambridge and provides a central campus meeting point.

Yet Tvitec’s production goes far beyond jumbo glass units. In the Cubillos factory, more than 20,000 meters of high-performance glass was manufactured for façade specialists Scheldebouw. We’re talking about almost 5,000 pieces of glass from the ‘Made in Spain’ Tvitec brand.

Photos and more>>

600450 The large glass that covers the €1 billion R&D Centre glassonweb.com

Others also read

The SANCO Group is continuing its expansion across Europe. With WOLF Fenster AG in South Tyrol, Italy, the alliance welcomes a long-established, highly innovative new partner.
VacuMax™ Vacuum Insulating Glass (VIG) by Vitro Architectural Glass uses two tempered lites of glass, a hermetic edge seal, a getter for long-term performance and nearly invisible micro-pillars to deliver exceptional thermal insulation in a slim, lightweight profile.
For the 14-story Reverb Alton Collection apartment building in Kansas City, Burns & McDonnell chose Solarban® 70 Optiblue® glass to balance daylighting, views, and thermal efficiency with the character of the historic Crossroads Art District.
Vitro's Solarban® 72 Starphire® glass brings clarity and energy efficiency to Pittsburgh International Airport's new terminal.
Optimize gas fill verification with the right measurement mode.
A new Glass for Europe series examines how national regulations integrate the solar factor in buildings.

Add new comment

From industry

Polígono Lalín 2000
36512 Lalín Pontevedra
Spain

Ctra. Estación Km. 15.8
44415 Rubielos de Mora Teruel
Spain

Ottergemsesteenweg 707-Zuid
9000 Ghent
Belgium

Polígono Industrial El Bayo, parcela I, 19
24492 Cubillos del Sil León
Spain

NEWS RELATED PRODUCTS

A+W Software GmbH
Luoyang North Glass Technology Co., Ltd.,
A+W Software GmbH
Glas Trösch Holding AG