Vetrotech Saint-Gobain Launches Improved PYROSWISS SBS

Vetrotech Saint-Gobain Launches Improved PYROSWISS SBS
Photo source
www.vetrotech.com

Date: 2 October 2017

The updated PYROSWISS Smoke Barrier System (SBS) offers more flexibility in size and is even easier to install in a shorter amount of time.

PYROSWISS SBS provides a transparent, frameless fire resistant barrier that guarantees comprehensive smoke protection for up to 120 minutes.

The product is designed to control the movement of fire and hot smoke within buildings in the event of fire, blocking or rechanneling the passage of smoke or heat from a smoke-filled area to adjacent parts of the building and providing a safe escape route.

Vetrotech has made a number of significant improvements to the product, which has various uses including smoke reservoir boundary, channeling screens, corridor containment, and escalator and elevator containment.

PYROSWISS SBS consists of toughened fire resistant safety glass with a choice of two fixings; Eco, a steel fixing or Design, a stainless steel fixing.

 

Larger sizes, fast and easy to install

As well as now providing PYROSWISS SBS in much larger dimensions (up to 2960 x 1500 mm), with both landscape and portrait size options, it includes two holes and fittings per panel for a faster and cost effective installation.

Improvements also incorporate the addition of a brand new unexpected glass breakage protection ‘SAFE’ film option which prevents the glass from scattering if shattered.

Faster and easier to install, the products can be implemented to complement architectural trends both internally and externally.

With its new, larger dimensions, landscape and portrait application options and its unexpected glass breakage protection, the improved product brings a number of new benefits for architects and specifiers alike.

600450 Vetrotech Saint-Gobain Launches Improved PYROSWISS SBS glassonweb.com

Others also read

Join the dialogue! Face Time 2020: Better Buildings through Better Skins
The annual Glazing Summit conference, due to take place in October, has been postponed until 2021 due to uncertainties around social distancing.
For Mappi summer has never been a period of closure, of vacation, but the time to continue producing, to remain always available to our customers and to devote greater efforts to research and development.
Among the highlights of the open-concept building is a ceremonial curved staircase, created by Trex Commercial Products using HDS technology to 3-D scan the structure and deliver a custom fabricated design.
Walker Glass continues it series on Bird Safe Glass with an episode detailing the various levels of legislation that exist to protect birds from colliding with glass structures.
Save birds’ lives, without sacrificing sustainability, solar control or aesthetics.

Add new comment

From industry

Polígono Industrial El Bayo, parcela I, 19
24492 Cubillos del Sil León
Spain

No. 160 Yichuan Rd.,
Jiaonan Shi
Qingdao Shi
Shandong Sheng, 266000
China

10924 Granite Street, Suite 200
Charlotte, NC 28273
United States

NEWS RELATED PRODUCTS

sedak GmbH & Co. KG
Luoyang North Glass Technology Co., Ltd.,