Others also read
HORN Glass Industries has successfully completed the modernization and automation of the tin bath at Guardian Glass Corsicana, enhancing production efficiency with advanced technology and automation.
NovaSklo Trade, a project of the Ukrainian investment and industrial holding EFI Group, has signed an exclusive distribution agreement with NSG Group, one of the world's leading manufacturers of architectural glass.
The VOLTA pilot furnace marks a decisive milestone in the demonstration of hybrid melting for flat glass, following one full year of continuous operation.
As one of the world’s leading flat glass manufacturers, Şişecam continues to create value for the architecture and construction sectors with its Reference Projects Book, the out come of a meticulous study covering a broad global geography.
A smart retrofit can be just as transformative as a new investment—discover how AGC Interpane and Glaston modernized a tempering line to boost efficiency, flexibility, and sustainability for the future.
High-performance glazing enhances transparency, energy efficiency, and bird-friendly design at Washington State University’s new engineering hub.
When it comes to oversized architectural glass, size alone is never the real achievement.
At glasstec 2026 held in Düsseldorf from 20 to 23 October 2026 solutions for current and future challenges in the glass industry will be centrestage once again. The Hot Topics read: Artificial Intelligence (AI) & Digital Technologies,…
NorthGlass Showcases Advanced Curved Glass Expertise at AIA Conference on Architecture & Design 2026
NorthGlass showcased its latest high-performance architectural glass and façade engineering innovations at the AIA Conference on Architecture & Design 2026 in San Diego.
Şişecam has commissioned its new coated glass line in Tarsus to meet the growing demand.
Düzce Cam and HORN Glass Industries have marked a major milestone with the stone-laying ceremony for a new 800 tpd float glass plant in Bilecik, Türkiye.
From 20 March to 12 June, the European Commission organised a public consultation on the energy efficiency framework post-2030.
Şişecam, a global leader in glass manufacturing, has successfully commissioned its greenfield TR9 float glass line in Tarsus, Türkiye.
NGA calls on representatives from glass fabricators and manufacturers to participate in the PCR guidance development process
On 24 June 2026, TU Delft will host OpenFace Day, a hybrid event bringing together researchers, students, and industry professionals to explore the latest developments in façade design and engineering.
AIA has created a commitment framework to help architects better serve their communities by building resilience and disaster risk reduction into the design and planning of new construction and renovation projects.
From 1 to 5 July, the European Council for an Energy Efficient Economy (eceee) held its summer study around the Lac d’Ailette (France).
As the OPPO Global Headquarters façade surpasses 60% completion, NorthGlass is helping bring Zaha Hadid Architects’ visionary design to life through advanced curved-glass engineering and manufacturing expertise.
Located on the Coney Island waterfront in New York, 1515 Surf Avenue features EnduroShield glass protection to help combat salt spray, staining, and weathering while reducing long-term maintenance of exterior glass and railings.
EVERLAM has once again been awarded the EcoVadis Bronze Medal, reaffirming its commitment to sustainability and responsible business practices.
The planet doesn’t argue. It doesn’t negotiate. It sends signals—rising seas, raging wildfires, heatwaves, melting glaciers. We said 1.5°C was the limit. We are crossing it.
Why do so many luxury brands choose NorthGlass?
Vitro’s advanced glazing technologies are helping Harvard’s Gund Hall achieve significant improvements in energy performance and occupant comfort.
This industry is among the most energy-intensive sectors there are. Melting tanks operate round the clock, fossil fuels dominate production. Decarbonising this industry is a challenge.
For many installers, waste removal has traditionally been viewed as little more than a necessary operational task, arrange a skip, clear the site, move onto the next job.