The project comprised a 5 level building with a shopfront / curtain wall arrangement to the ground floor and a series of large structurally glazed fixed windows throughout the balance of the façade.

KFI were appointed by Hawkins Construction in association with Warren and Mahoney, RLB and Aurecon to engineer, procure, manufacture and install the various facades on the prestigious KEB project in Christchurch for Naghi Tahu Properties.

The project comprised a 5 level building with a shopfront / curtain wall arrangement to the ground floor and a series of large structurally glazed fixed windows throughout the balance of the façade.

Black glazed custom extruded ceramic tiles and standard through colour flat tiles were manufactured and installed onto a custom engineered support structure over RAB and structural framing, accounting for the required building movements and interfaces with glazed elements.

High performance (triple coated low E) double glazing was sourced through our supply chain, giving excellent thermal and solar control properties to the façade.

Through the lobby areas a full height glazed curtain wall provides light into the building from both north and south elevations.

KFI Project: King Edward Barracks

Products Used

  • KFI 180mm Unitised Curtainwall
  • KFI 160mm Unitised Curtainwall
  • Glazed terracotta tiles (ribbed and flat profile)
  • Through colour terracotta tile (flat profile)
600450 KFI Project: King Edward Barracks glassonweb.com

Others also read

SAF Sunshades will reduce solar heat gain and control glare to allow the designer to optimize their use of natural daylight.
Baltisse has completed the acquisition of Polflam, a Polish fire-resistant glass manufacturer rapidly expanding across Europe.
Among the skylight glass panes, 8632 glazed tempered and insulated glass panes were provided by Tianjin NorthGlass, one subsidiary of NorthGlass Group.
With the reconstruction of the production facility in Elchingen, Gugelfuss fulfilled the requirements for further growth.
In the end of January, Lindner Facades Ltd. installed the last element of the impressive glass facade in the new building on 1 Bank Street in London.
Epwin Window Systems’ hardware brand Safeware has just announced an impressive 12% growth in year-on-year turnover.

From industry

10301 North Enterprise Drive
Mequon, WI 53092
United States

40 Corniche El-Nil,
Al Sharafain Tower Maadi,
Cairo Governorate
11728
Egypt

Add new comment