KEO Completes Two Projects In Al Ain

KEO International Consultants has completed two major projects in Al Ain, UAE with a combined value of AED 257million.

With only a few details to be finalised, the developments' unique designs set them apart in an Emirate not yet known for its architectural achievements.One project, the new IT College located at the University Maqam Campus, saw KEO provide architectural, interior and landscape design.The consultancy won the contract during a design competition in 2000.

The building's centrepiece is a central garden atrium four storeys high connected to the rest of the building by a series of glass bridges.

The design is heavily focused on sustainability as Imad Luaaby, resident engineer explained: "The skylight of the building was designed to control solar gain in day time. Most of the glass in the building is heat reflecting glass."

The project is also the first of its kind in the region to air conditioning units that provide cold air through raised flooring. The building will provide for a student population of 3,000 over an area of 34,500m².

The second development is the New Diwan Project designed to house the executive offices and meeting rooms for the ruler's representatives. KEO designed the building with dramatic curved facades and large interior entryways. It also has one of the largest glass domes of its kind in the Emirate.

600450 KEO Completes Two Projects In Al Ain glassonweb.com

See more news about:

Others also read

Guardian SunGuard® SuperNeutral™ (SN) 70/37 coated solar control glass was selected for its beautiful, neutral, transparent appearance with low reflection, consistent colour, high solar protection and high light transmission.
"Right product, right place" - this is the motto of the NSG Group's trade fair presence at BAU 2019.
How Suntuitive® Dynamic Glass was implemented at the University of New Mexico Anderson School’s new McKinnon Center for Management
The ‘World of Innovative Glass Lamination Solutions’ – an international design competition for projects using laminated glass or laminated safety glass – took place between June 11 and September 7.

From industry

Polígono Industrial El Bayo, parcela I, 19
24492 Cubillos del Sil León
Spain

NEWS RELATED PRODUCTS

Add new comment