RP Technik: Revitalisation of the Eiffel Building

Revitalisation of the Eiffel Building
Photo source
RP Technik GmbH
The building owner and general contractor chose the material steel and therefore decided to use the highly insulated, slim steel window system RP-ISO-FINELINE.

The Eiffel Building was built 1928 to 1941 on the outskirts of Maastricht by the Dutch ceramics producer Royal Sphinx. The multi-storey industrial complex consists of three factory buildings and matches the industrial architecture at the time. The whole complex is already since 1996 under monumental protection due to building history.

In the year 2006 the production of the sanitary ceramics was displaced. Since then the historical factory site is unused from what the building condition suffered noticeably.

For the Revitalisation of the Eiffel Building, an overall concept with a completely new use perspective was developed, respecting the monument conservation guidelines and current energetic requirements.

The building owner and general contractor chose the material steel and therefore decided to use the highly insulated, slim steel window system RP-ISO-FINELINE. The filigree and slim steel profiles are ideally suitable for the use in listed buildings or houses which are worthy of preservation.

The thermally insulated profile system offers space for highly insulated double or triple glazing, sharp –edged profile edges, by analogy with the historic examples, the use of long lasting rubber sealing profiles as well as concealed drainage opening without disturbing plastic parts on the visible surface.

Face widths of filigree 25 mm are possible with RP-ISO-FINELINE profiles. Thanks to the high stability of the material steel alone, the specific window constructions could have been realised, that are filigree as well as high strength.

In total 494 window elements were installed in the façade of the Eiffel Building.

The Eiffel Building shows the successful conversion from a fallow industrial complex to a vital meeting place with modern residential accommodations and offices.  However the main use of the building is dedicated to a student hotel with 378 fully furnished rooms that are mainly rented to international students.

Companies involved in the project:

Architect: Braaksma & Roos Architekten Maastricht

Metal working company: Smits Gemert B.V.

General Constructor: BAM Bouw en Techniek – Regio Maastricht

Building owner: Belvédère WOM B.V.

600450 RP Technik: Revitalisation of the Eiffel Building glassonweb.com

Others also read

 66 York Street
The window products used were the Universal Windows and Doors Series 700 Aluminum Steel Replica and the Series 500 Aluminum Historical Double Hung.
Containing the triangle of combustion | Wrightstyle
Tim Kempster, Wrightstyle’s managing director, explains the dynamics of fire.
The combination of different materials presents a variety of different design options for photovoltaic modules. ©Fraunhofer ISE
Building-integrated photovoltaics (BIPV) places high demands on solar PV module design.
Airborne Mini on Glassline’s Impressive Glass Canopy
Undoubtedly one of the most impressive exhibits at this year’s “Fensterbau/Frontale 2018” in Nuremberg – the flagship show for windows and doors – was the airborne Mini exhibited by Glassline, from Adelsheim in southern Germany.
Roto AL: New Turn-Only hinge for outward opening windows
Expanded application range of “Roto AL” / New Turn-Only hinge for Top-Hung and Side-Hung windows / Equipped to meet special requirements in outward opening windows / Proven technology for windows that remain reliable in the long term.
glasstec
Due to the internationalization of the glass sector, and in line with our growth policy, next October we will be present at Glasstec, one of the most important trade fairs in the sector.

From industry

Am Pfahlgraben 4
35415 Pohlheim
Germany

Add new comment