Project Case Study: GBCA HQ façade replacement
Photo source
© Jeffrey Totaro
Etched and lit spandrel glass highlights the new curtain wall.

 

GBCA

The General Building Contractors Association (GBCA) is the Philadelphia chapter of the Associated General Contractors of America.

The organization makes its home in the 1961 James W. Baird Savings & Loan Association Building on 18th Street in Center City, from which it provides advocacy, networking, safety, education, and training to more than 250 member contracting companies.

Most AGI member glazing contractors are likely quite familiar with the two-story, cube-shaped building. It sits tucked between taller buildings in the heart of the city. Today, following a façade replacement project that included both new etched glazing and LED lighting, the building shines more like a jewel box.

Original facade
Original facade | Image courtesy BKP

 

INNOVATIVE THEN

The Baird Building was quite innovative for its day. Its original construction utilized a waffle-slab concrete structure with columnfree clear spans across the 40-foot-wide building. The façade included a curtain wall with glass butt-glazed directly to the concrete structure.

However, after 56 years, the façade showed itsage. Cracked sills, deteriorated joints, and low-efficiency glass were some of the poor conditions of the existing curtain wall.

New curtain wall installation with  the sidewalk closed for pedestrian safety
New curtain wall installation with the sidewalk closed for pedestrian safety | Image courtesy BKP

 

INNOVATIVE NOW

AGI-case-studyPhiladelphia-based architecture firm, BKP Architects (formerly Buell Kratzer Powell) was engaged by GBCA to replace the 1,000-squarefoot façade. The project was one of a series of building updates overseen by general contractor Clemens Construction Company.

“We wanted today’s solution to be as cutting-edge as the original design,” said BKP Principal Darrell Kratzer, AIA, LEED AP. “We took our inspiration from midcentury modern storefront designs and from contemporary glass box architecture, including the Apple stores.”

 

TEAMWORK

Eureka was hired as project GC and self-performed all scopes of the renovation except drywall, interior barricade, and environmental demolition. According to Eureka Site Foreman Steve Finkbiner, Eureka and Clemens worked together to ensure safe conditions for building occupants and pedestrians along busy 18th Street.

Eureka Field Operations Supervisor Joe Deluisi said, “Any time we take on a project within a working environment, we look at mitigating all safety issues. Our main objective is to keep people safe.”

Finkbiner and Deluisi explained that GBCA staff and visitors were redirected to a safe entrance and the sidewalk was secured. The building interior was protected from construction and weather conditions with temporary interior walls three feet away from the curtain wall installation.

Interior  conditions showing the protection partition and waffle-slab  concrete structure
Interior conditions showing the protection partition and waffle-slab concrete structure | Image courtesy BKP

 

NEW FAÇADE

Kratzer explained that in redesigning the façade, his team began with an eye toward energy efficiency, examining curtain wall options that would improve the building’s heating and cooling performance.

BKP selected YKK’s YCW 750 outside-glazed, open-back curtain wall system. The aluminum-framed pressurewall system incorporates butt-glazed insulated Viracon one-inch VE24-2M Optiwhite vision glass in oversize pieces.

The new curtain wall system features vertical butt-glazed joints for maximum transparency to the GBCA lobby on the first floor and boardroom on the second floor. Passers-by have direct views to the classic midcentury interior aesthetic of polished marble floors and oak-paneled walls.

Viracon one-inch VE24-2M Optiwhite spandrel glass covers the waffle slab intersection at the second floor. The spandrel glass is etched with a custom silkscreen GBCA logo for dramatic branding.

Diversified Lighting worked with BKP to develop a way to illuminate the spandrel glass and donated the LED lights used to backlight it. Eureka had experience installing both the YKK system and the Viracon glass. The project was completed on schedule and without any unexpected issues.

“It is 1,000 times different from the old curtain wall,” said Finkbiner. “For a small building, it now really stands out. You couldn’t really see inside before or know GBCA was there; now you can’t miss it.”

 

AGI Glazier
Eureka Metal & Glass Services, Inc.
Philadelphia, Pa.

Team
Architect: BKP Architects
GC: Clemens Construction Company

Client
General Building Contractors
Association | Philadelphia Chapter
of the Associated General
Contractors of America (AGC)

Completion
May 2017

600450 Case Study: GBCA HQ façade replacement glassonweb.com

Others also read

Glasstec: Bohle presents the Best of Two Worlds
At this year´s glasstec, Bohle Group showcases a completely new trade fair booth concept: Visitors will experience “The Best of Two Worlds” (Hall 9, Booth D42/F42) over the almost 1,000 m² stand.
Fall Conference 2018
On Tuesday, September 11 over 100 members convened for the first Fabricating Committee meeting of the newly combined NGA and GANA.
Chris Matthews
During this already active hurricane season, the American Architectural Manufacturers Association (AAMA) will host a webinar about lessons learned from 2017’s Hurricane Irma, which primarily impacted Florida.
The wide parts of the Schüco ALB large louvre blades mounted in front of the façade are between 3.00 and 3.50 metres high and are moved by means of motors and gearboxes, which are integrated in the aluminium load-bearing profiles.
The façade of the RAL building in Bonn unmistakeably showcases the identity of the client and user of the building.
Glazing Vision: Eaves flushglaze rooflight creates feature for commercial tuning shop
Glass rooflights for commercial buildings are being specified more frequently, as architects are tasked with creating work spaces that are more engaging and that maximise productivity.
Tirana New Bazaar
Guardian SunGuard®  HD Royal Blue coated glass was used to glaze the roof of the pavilion and Guardian ClimaGuard® Premium2 coated glass was used on the façade.

From industry

10301 North Enterprise Drive
Mequon, WI 53092
United States

10924 Granite Street, Suite 200
Charlotte, NC 28273
United States

NEWS RELATED PRODUCTS

Diamon-Fusion International, Inc.
Diamon-Fusion International, Inc.
Diamon-Fusion International, Inc.
sedak GmbH & Co. KG
Trex Commercial Products
HHH Tempering Resources, Inc.

Add new comment