Bullet-resistance of Thiele Glas laminated safety glass certified for an unlimited period

Bullet-resistance of Thiele Glas laminated safety glass certified for an unlimited period
Photo source
www.thiele-glas.de

Date: 14 July 2017

Only a handful of German companies are approved to produce bullet-proof glazing. Thiele Glas has been part of this for several years.

Now, this certification was not only extended, but rather warranted by the administrative office for bullet-proof glazing in Ulm.

Bullet-resistance of Thiele Glas laminated safety glass certified for an unlimited period

Bullet-resistance of Thiele Glas laminated safety glass certified for an unlimited period

Bullet-resistance of Thiele Glas laminated safety glass certified for an unlimited period

Thus, for the following VSG types the bullet-resistance is confirmed for an unlimited time.

Thus, for the following VSG types the bullet-resistance is confirmed for an unlimited time.

*S = splintering | NS = splinter-free

Bullet-proof glazing is especially popular in public or private buildings, where personal protection is a major concern.

With laminated safety glass a similar bullet protection can be provided, such as for example with a concrete wall, but without impairing the field of vision.

The multiple safety glazing can also be further processed, for example, into insulating glass (see sample photo - construction with low-iron glass to avoid discoloration and fogging).

Please contact us and we discuss how we still can make your buildings even safer without restricting your field of view.

600450 Bullet-resistance of Thiele Glas laminated safety glass certified for an unlimited period glassonweb.com

Others also read

FENSTERBAU FRONTALE is open for your industry dialogue.
The 30 tpd end fired furnace for crystal glass was modified together with the two production lines and partly equipped with furnace equipment by HORN.
SentryGlas® ionoplast interlayer from Trosifol helps deliver strength, clarity, energy efficiency and protection to Miami’s Brickell Flatiron, the city’s tallest condominium.
The glass production of the future will be fully networked and digitalized. Alongside digital support for employees, it will provide quick insight into machine capacity and even the current position of a specific pane.
The BAU Exhibition Director, Mirko Arend, will leave Messe München on 31 July.
HORN supplied the end fired furnace designed with appliance of the most advanced technology to save energy, reduce emission values and extend furnace life.

Add new comment

From industry

Am Pfahlgraben 4
35415 Pohlheim
Germany