HORN Glass Industries AG receives new order for end fired furnace in Thailand

 HORN Glass Industries AG receives new order for end fired furnace in Thailand
Photo source
www.hornglass.com
In January 2017 HORN received its latest order from the Osotspa Group, Siam Glass Plant in Thailand for the rebuild of a 250 tpd (tonnes per day) - end fired furnace with 3 production lines.

Siam Glass Industries was established in 1977 and produces narrow and wide-necked bottles in flint and amber color.

The current furnace rebuild is the AY 102 furnace in the Ayutthaya factory, located in Ayutthaya Province. The total plant production capacity is approx. 600 tpd.

The main focus of the design for the new end port furnace is low energy consumption, glass quality and low environmental emissions.

Furthermore, the Glass conditioning will be specially designed and equipped for modern NNPB lightweight production.

The furnace will produce 250 tonnes of amber bottles for energy drinks per day.  

600450 HORN Glass Industries AG receives new order for end fired furnace in Thailand glassonweb.com

See more news about:

Others also read

Value Windows and Doors has added a new way for dealers to order its products that is faster, more accurate and costs less.
Up to 70% cost savings can be achieved when using ISO-BLOCO ONE high performance foam tape from ISO-CHEMIE to install and seal windows.
Octatube has been contracted to build the internal eye catcher; a 4 storey, glass, spiral-ascending structure.
Rapid and effective air and weather tight sealing around windows and doors is provided by a new easy-to-use collar system from foam sealants specialists ISO-CHEMIE.
The largest event for the Iranian solar industry is being expanded to two days.
At China Glass 2018 the Fenzi Group will introduce a new line of ceramic paints for the decoration and personalization of glass containers.

From industry

Am Pfahlgraben 4
35415 Pohlheim
Germany

Add new comment