Others also read
BAU ONLINE meets with great response: so far, 190 exhibitors (status December 17) have registered to offer live presentations and one-on-one meetings at the digital event held from January 13 to 15, 2021.
Glaston Group has closed a deal for three insulating glass lines with one of the leading architectural glass suppliers in China, CSG Holding Ltd.
In this video the topic Software Data Transparency at LiSEC is clearly presented.
As a result of the negotiations, the company will terminate a maximum of six (6) employment relationships.
The Elb 9 + 2 is capable of producing a complex profile on the edge of the glass in a single pass without the need to process the glass on different machines or change setups.
It could be in 2022. The proposal to proclaim the 2022 as International Year of glass is currently being examined by the United Nations General Assembly.
Under the umbrella of the VDMA (German Engineering Federation), A+W Software-GmbH is part of the umati community.
Pochet du Courval commissions melting furnace with HORN® combustion and functional safety system
The existing furnace will be enlarged by HORN® and equipped with new heating equipment and safety control.
This session introduce the elements, effects and measurement of sound, and provide the acoustic laminated glass design process with worldwide case studies.
Integrated software solutions for the entire production chain are adapted for individual customer segments.
The registration documents for the German joint stand at Mir Stekla are now available.
BAU ONLINE will provide valuable guidance in turbulent times
For the production of coated glass products, Şişecam Trakya relies on fully automatic inspection with ISRA VISION P2 (PowerPlate) - Coating – thereby raising both customer satisfaction and efficiency.
How can you prolong the lifetime of your equipment? Find out in LiSEC's new video!
The Rapidstore, as an automated storage system, simplifies manufacturing methods and gives business owners greater capacity.
Vitro Architectural Glass (formerly PPG Glass) announced that Chris Fronsoe has been appointed national architectural manager for the Northwest region.
The entire construction and commissioning was supervised and managed by HORN®.
This presentation reviews the glazing solutions for buildings provided by laminated glass together with recent innovations in interlayer technology.
How does LiSEC.eye work? What advantages does LiSERV offer? Answers to these questions and much more information can be found in the new video.
Joe Khoury explains why his company advertises itself as the leading curtain wall consultant in Asia.
HORN® Glass Industries supplies an all new float glass plant with a production capacity of 250 tons of glass per day.
Three questions to Reinhard Pfeiffer, Deputy CEO of Messe München.