MiTek Announces the Hardy Frame® CFS Moment Frame™, the Industry’s First Cold-Formed Steel Moment Frame

MiTek Announces the Hardy Frame® CFS Moment Frame™, the Industry’s First Cold-Formed Steel Moment Frame
Photo source
www.mitek-us.com

Date: 2 August 2018

Replacing Structural Steel Alternatives, Hardy Frame CFS Moment Frame is a Stackable, Cold-Form-Steel System for Lateral Force Resistance.

MiTek USA’s Hardy Frame® brand now offers the CFS Moment Frame, the industry’s first coldformed steel (CFS) moment frame.

Built upon the success of Hardy Frame’s HFX Panel, the new CFS Moment Frame is the industry’s first cold-formed steel prefabricated moment frame.

The CFS Moment Frame offers very high lateral load resistance in narrow-wall or pier lengths, ideal for providing design freedom to create large architectural openings for moveable glass walls and windows. The “picture frame” iteration of this product – distinguished by beams at the top and bottom with moment connections at all four corners – is called the Hardy Frame® CFS Picture Frame™, and it is extremely effective in multi-story design and construction.

In either configuration, the allowable lateral shear value of CFS Moment Frames are approximately equal to four or five HFX Panels of similar widths. The CFS Moment Frame can also be installed “back to back” to double the capacity.

The lower beam in the CFS Picture Frame™ bears on wood floor systems and distributes overturning compression forces to limit crushing and reduce deflection, all in a wall dimension that is narrower and more-effective than multiple wood posts.

In addition to lateral shear resistance and distribution of compression forces to wood members below, when combined with the Hardy Frame Z4 continuous tie-down, the system will also transfer overturning and uplift tension forces that result from wind and seismic loading to the foundation.

The new CFS Moment Frame’s complement the other Hardy Frame Shear Wall Systems to provide a full spectrum of solutions.

“CFS Moment Frame fills a need for designs that require narrow wall dimensions along with the benefits of a bolted moment connection of cold-form-steel components,” said Jesse Karns, Director of Engineering, Lateral Load Systems for MiTek. “This is something no other prefabricated lateral system can provide.”

600450 MiTek Announces the Hardy Frame® CFS Moment Frame™, the Industry’s First Cold-Formed Steel Moment Frame glassonweb.com

Others also read

FGIA updates AAMA 501-24 recommended practice for exterior wall systems testing.
Business Pilot’s MD Elton Boocock explains why he was the first to pick up the phone when the FIT Show, FENSA and GGF announced their new Glass Conference in October.
Quanex Building Products announced it will acquire Tyman, a London-based producer of fenestration components and access solutions.
Find information to support education and awareness of window use
NorthGlass won the "Preferred Brands of Architectural Glass" and "Supreme Award of the 10th North Star Architecture Award"
EPPA, the European Trade Association of PVC Window System Suppliers, is pleased to announce the appointment of Elena Vyboldina as its new Managing Director, effective from April 1st, 2024.

Add new comment

From industry

NEWS RELATED PRODUCTS

Diamon-Fusion International, Inc.
A+W Software GmbH
Diamon-Fusion International, Inc.
Diamon-Fusion International, Inc.
Diamon-Fusion International, Inc.