First Project over the line for the M+W Group

Project Catapult, Stevenage
Photo source
www.dortech.co.uk

Date: 7 August 2017

This is Project Catapult, constructed by the M+W Group. The building houses a major new, world-class research and manufacturing facility and is located in Stevenage.

The new facility is able to manufacture late phase clinical trials and early supplies of the most advanced therapeutic medicinal products (ATMP’s) including cell and gene therapies.

This fantastic looking building was designed by Fairhursts Design Group and incorporates over 1,000m2 of curtain walling and entrance screens.

The curtain walling grid includes a combination of capped and capless curtain walling in order to give the building design a vertical emphasis.

Technals MX curtain walling suite was used throughout the facade design.

For further project information and images, please click HERE.

600450 First Project over the line for the M+W Group glassonweb.com

Others also read

Thermoflex Warm Edge Spacer is a highest performance flexible spacer system used to create the airspace within a double glazing unit.
This report delivers timely information on window, door and skylight market trends and product relationships.
FENEX Virtual Expo boasts state of the art technology from NexTech AR
Window companies on the path to Industry 4.0
Principe Amedeo 5, glazed for Gualini, candidate for the Mies Van der Roe E.U. Prize for Contemporary Architecture
The JaBee Tower, which has been erected in the town of Dübendorf (Switzerland), is currently the highest residential building in Switzerland. It was designed by the Swiss company sattlerpartner architekten+planer.

Add new comment

From industry

Am Pfahlgraben 4
35415 Pohlheim
Germany

NEWS RELATED PRODUCTS

Glasmik d.o.o. - Branch Office MARIBOR
Guardian Europe
sedak GmbH & Co. KG
Guardian Europe
sedak GmbH & Co. KG