CMS Window Systems delivers efficient installation for engineering giant's new Scottish facility

Photo source
www.cmswindows.com
CMS Window Systems has played a key role in the manufacture and installation of thermally-efficient curtain walling, windows and doors for Emerson Process Management’s new facility at the new D2 business park, Aberdeen.

Emerson is one of the world’s foremost names in engineering services across a wide range of industrial and commercial markets, and places high value on the efficiency and integrity of its staff, operations and facilities.Efficiency, therefore, was a high priority when Emerson Process Management – a branch of the company which focuses on developing problem-solving technologies and services for industrial businesses – acquired a site at the D2 business park in Dyce, Aberdeen to support its work with the North Sea oil and gas industry.

CMS was appointed by main contractor Bowmer & Kirkland to design, manufacture and install curtain walling, windows and doors for the facility. The £20 million development, built to replace Emerson’s existing Aberdeen headquarters in nearby Kirkhill, comprises 2,600 m2 of office space, as well as a 3,065m2 service centre with meeting facilities and a customer collaboration suite, and can accommodate up to 200 Emerson personnel. Reflecting this code of efficiency, the facility adheres to exacting thermal performance standards and complying with the latest requirements of current building regulations. With site development overseen by Miller and construction completed by Bowmer & Kirkland, work on Emerson’s new Aberdeen premises began in June 2014, with CMS joining the project in February 2015.

The solutions delivered by CMS were chosen to enhance the efficiency of the building’s envelope, reducing heat transfer while allowing the entry of natural light. Aluminium curtain walling created using Metal Technology’s System 17 ensures the building adheres to exacting thermal performance standards. With a continuous thermal isolator providing a thermal break throughout the system, as well as 6mm toughened Planitherm Ultra N glass used in conjunction with 16mm Swisspacer V warm edge spacer, the system is compliant with the latest thermal requirements of current building regulations.

Since planning consent was granted in 2012, D2 has become one of the biggest mixed use developments in Scotland for many years, aiming to support industry in the area with its versatile premises and convenient transport links. Emerson’s cutting-edge new site on the park forms part of this; Stuart Brown, General Manager of Emerson Process Management UK and Ireland, said: “[c]onsolidating three existing facilities in the Dyce area into a single leading-edge building close to the Aberdeen airport demonstrates Emerson’s commitment to support our Scotland and North Sea customers.”

The D2 development has also achieved wider recognition at the tail end of 2015 as it has been named as a finalist for the Architectural Excellence Award (Commercial Buildings) in the 2016 Scottish Property Awards.

For further information, visit www.cmswindows.com.

600450 CMS Window Systems delivers efficient installation for engineering giant's new Scottish facility glassonweb.com

See more news about:

Others also read

Twinbolt locking system
P C Henderson is pleased to launch our new Twinbolt locking system for use with our leading exterior door hardware system, Securefold.
Mila announces plans for FIT Show 2019
Mila has announced that it will be back at the FIT Show in 2019. The hardware specialist, which made such a memorable impact at the show in both 2013 and 2016, is promising an exciting stand once again, packed with new products and innovations.
Technal specified for University Healthcare Building
Working with BAM Construction North East and Glasshus, Technal supplied its MX Visible Grid curtain walling, PY 55 doors and FY 65 windows to the project, specified due to their versatility and aesthetic qualities.
Ben Alcock
Ben Alcock, Business Development Manager at sealant, adhesive and tape specialists illbruck, explains why impregnated tape is the future of window installation.
ClearVue receives AS 2047 accreditation allowing for sale of its high-tech solar window in Australia
Smart building material company ClearVue Technologies Limited is pleased to announce it has now taken the next step on its commercialisation path, confirming certification of its solar window technology to Australian Standard AS 2047 (refer to ASX
Announcement of 4 June 2018).
Epwin Glass unaffected by glass shortage
Recent reports suggest there is a glass shortage in the UK that is threatening to affect the supply of glass IGUs to the industry.

From industry

NEWS RELATED PRODUCTS

Thermoseal Group Ltd.
Thermoseal Group Ltd.
Wrightstyle Ltd.

Add new comment