MOST VIEWED NEWS IN PAST 7 DAYS

8433 results
| G-FITTINGS has over 20 years of experience in the production of all-glass fixtures and glass doors. The product solutions are used all over the world, from the single system to the object application.
| CO2 emissions well below the industry average
| Şişecam has finalized its partnership agreement with ICRON, a Turkish technology company that provides decision optimization services at operational and strategic levels.
| Laser finishing can be used to produce custom, functional and decorative glass products.
| The most important feature of NorthGlass top series of tempering furnace is the intelligent temperature control system.
| Aria Holding will invest over INR 2,000 Crores to establish a state-of-the-art float glass manufacturing facility in Maharashtra.
| The National Glass Association (NGA) has announced new locations for GlassBuild America: The Glass, Window & Door Expo in 2024 and 2025.
| NorthGlass is not only an architectural element here but also a symbol of transparency, connection, and artistic expression.
| Constructed of powder coated aluminium, the canopy sits proudly on top of double glazed glass panelling (two panes of 10mm thick toughened laminated glass), forming the structure of the lobby construction.
| Shifting into sophisticated High-Tech Design
| With architecture and automotive, the company has two times the innovation to share.
| Experience the first ever virtual LiSEC Campus!
| The Future of Glass and Window Manufacturing
| The Fenestration and Glazing Industry Alliance (FGIA) has updated two documents addressing fenestration anchorage.
| An all-time great, heat-treated for player and fan safety.
| Providing project flexibility and design durability advantages for architects and glass laminators
| Guardian Glass has attained Bronze level Cradle to Cradle re-certification for its float, coated and laminated glass product ranges.
| FK Group has purchased aluminium fabrication specialists Premo Fabrications and, as of today, the company is part of the FK Group.
| The new EUR 84 million glass packaging furnace is planned to be commissioned at the beginning of 2023.
| Energy efficiency is one of the key ways to make the electricity you use in production go further.