ZIPPE installs latest Batch&Cullet Preheater

Date: 6 October 2010

Company ZIPPE Industrieanlagen GmbH has recently installed a new batch & cullet preheater at a container glass furnace of a major bottle producer in Europe.

The preheater was retrofitted into an existing furnace situation during production and has a capacity of approximately 350tons.



The system, which is installed in the Netherlands, is designed for the full capacity and supplies one doghouse with preheated batch & cullet. The system was commissioned in July 2010, is running successfully and shows significant energy savings. After several installations in the 1980ies and 1990ies, this preheater now represents the latest installation in the glass industry.



By this, company Zippe, an experienced pioneer in this technology, contributes significantly to a sustainable and energy efficient glass production

600450 ZIPPE installs latest Batch&Cullet Preheater glassonweb.com

See more news about:

Others also read

The Ain Sokhna float plant in Egypt will see its capacity increased with the construction of a second flat glass production line.
In addition to the five-part video series, Glass for Europe is thrilled to unveil a two-pager Manifesto outlining its priorities and policy recommendations for the 2024-2029 mandate of the European institutions.
Enhanced solar control glass with exceptional performance
The plenary session of the European Parliament has voted in favor of the recast Energy Performance of Buildings Directive, one of the final texts of the ‘Fit for 55’ package.
Secondary glazing involves installing an additional windowpane on an existing window to improve insulation.
Energy Star, a trusted symbol for energy efficiency, extends its influence on windows, offering consumers a reliable benchmark for making environmentally conscious choices.

Add new comment

NEWS RELATED PRODUCTS