TU/e Hoofdgebouw in Eindhoven

TU/e Hoofdgebouw in Eindhoven
Photo source
www.rollecate.nl
By combining optimal recycling with state-of-the-art materials, the robust TU/e main building from the sixties will be transformed into a transparent and energy efficient University building.

Rollecate has been commissioned to supply and install the aluminium window-frames and curtain walls.

We have been able to further optimize the system which is used for this project which allows for many logistic and qualitative advantages.

The new glass curtain wall with windows, which can be opened automatically and individually operated, is equipped with a triple solar control glazing (triple glazing) with double fabric which consists out of an indoor sun and light resistance on the inside.

By using state-of-the-art materials, this ‘simple’ curtain wall receives the Rc-values of a double skin façade.

Through the application of this type of curtain wall, as much as possible already existing (façade)construction can be maintained (sustainable and cost-effective), while meeting more than the required energy efficiency, daylight and appearance.

The goal is to earn the university building the ‘Outstanding’ rating of BREAAM (a leading sustainability assessment method)

Architect: Team RSVP (collaboration between Team V, Van Rossum, Valstar Simonis en Peutz)
Contractor: Van Wijnen Rosmalen B.V.
Client: Technical University Eindhoven

600450 TU/e Hoofdgebouw in Eindhoven glassonweb.com

Others also read

The new Dusit Hotel will incorporate the ventilated facades of Sistema Masa in its design and construction.
St. Cloud Window Inc., a leading manufacturer of the high-performance aluminum window, door, and curtain wall products is pleased to introduce the SCW3000 Series, a new line of historic replication/narrow sightline windows and terrace doors.
WICTEC is an overall concept of modern-day architecture that reconciles the elements of heat storage, air conditioning, light provision and fire and noise protection within a single façade design.
Atlas promises to make 2018 the best year yet for its elite network of installers as it reports that a staggering 90% of quotes received for the Atlas Flat Rooflight convert to sales.
MVRDV has been selected by Maarsen Groep for a new 50,000 m2 mixed-use tower complex marking the third phase of the Weenapoint development in Rotterdam’s Central District.
Macro, Mace’s facilities management division, has been appointed to manage The Crest, a luxury residential development of 765 units across six towers in DLF5, Gurugram, India.

From industry

40 Corniche El-Nil,
Al Sharafain Tower Maadi,
Cairo Governorate
11728
Egypt

Add new comment