PR60 - Optimised Sealing System to Avoid Condensation

PR60 - Optimised Sealing System to Avoid Condensation
Photo source
www.ebsa.com.au
Through a special sealing system, the LAMILUX CI System Glass Architecture PR60 ensures highly efficient ventilation of glass rebates and controlled drainage of water and condensate.

The overlapping multi-stage sealing system, which is designed without direct joints, has secondary drainage in the inner sealing layer. A joint-free, continuous drainage plane is thus guaranteed for the mullions/rafters even for joints to the supporting structure (for example, polygonal bends in barrel roofs). 

600450 PR60 - Optimised Sealing System to Avoid Condensation glassonweb.com

Others also read

Consolidated Glass Holdings, Inc., (CGH) will debut ACCESSGARD™ security glazing at booth #848 during the 2019 International Security Conference & Exposition (ISC East) at the Javits Center in New York City, Nov. 20–21.
Effective displays, demonstrations of specialized equipment and the opportunity to take a look at modern solutions for the construction industry and other sectors that use the huge potential of glass - this is the GLASS trade fair in a nutshell.
cube berlin is an eye-catching, 11-storey office building located at Washington Platz in the Europacity urban district of Berlin.
The 2020 Glazing Summit will take place on Thursday, October 8th at Edgbaston Stadium and Conference Centre.
The HEGLA Group, HEGLA TaiFin, HEGLA-HANIC and HEGLA boraident will be exhibiting jointly under the motto “Shaping the future and providing impulses for the present”.
The company will present its software for glass fabricators and window and door manufacturers.

From industry

NEWS RELATED PRODUCTS

sedak GmbH & Co. KG
sedak GmbH & Co. KG
Luoyang North Glass Technology Co., Ltd.,

Add new comment