Positive feedback on Heye Process Control with Press Duration Control

Date: 17 September 2013

Arturo Garcia from SIVESA in Mexico is impressed: “It is fascinating how fast we come to good results. The Press Duration Control from Heye makes many article defects a thing of the past.

In addition, fast and efficient job changes without long trial and error phases become a reality.”    

In brief, the Press Duration Control solution avoids too short a press duration (unfilled finishes, hollow necks, thin shoulders and thick bottoms), while also avoiding a press duration that is too long (press marks, vertical finish checks, thin bottoms, seams in the finish and blank mould seams).

The Press Duration Control is an optional feature for the Heye Process Control. 

600450 Positive feedback on Heye Process Control with Press Duration Control glassonweb.com

See more news about:

Others also read

The Education Center Erasmus MC Rotterdam has won the Rotterdam Architecture Award. From a shortlist of 25 entries, the jury has chosen the design of Claus & Kaan Architecten.
Tecglass is one of the leading companies that design and develop a range of innovative Digital Printers for the glass industry.
Dr Henry Snaith of the University of Oxford has been named as one of the ten people who have made the most difference in science during 2013 in recognition of his work on next generation solar power technology.
Jim Rawson, chairman of Epwin Group was awarded the Derek Bonnard Award for Excellence at the G13 Awards, held at the prestigious Park Lane Hilton, London on November 29th.
Coverings ETC’s Bio-Glass in “Topaz Blue” designed by Ofer Mizrahi was bestowed the Interior Innovation Award-Winner 2013, the prestigious international design award of the German Design Council.
2013 Deep Research Report on China LOW-E Glass Industry was professional and depth research report on China Low-E Glass (LOW-Emissivity Glass) industry.

Add new comment