HORN® develops new Burner Bracket H-RAB

HORN® develops new Burner Bracket H-RAB
Photo source
www.hornglass.com

Date: 5 April 2021

The HORN® Rapid Adjust Bracket H-RAB offers a simplified adjustment of the correct burner angle to get replicable values.

The burner angle is a very important parameter, as it can have a strong influence on the melting process, furnace life and emission values. He further facilitates lower energy consumption. Therefore an accurate and rapid adjustment of the burner angle after burner replacement or cleaning is of utmost importance.

The HORN® Rapid Adjust Bracket H-RAB offers a simplified adjustment of the correct burner angle to get replicable values. With two adjusting wheels the operator can easily adjust both the horizontal and vertical angle. The centre point of rotation is the nozzle tip itself. Thanks to an integrated scale, the angle can be read off easily.

With regard to Industry 4.0 the holder is prepared for later installation of servo drives. With the input of additional information coming from NIR camera systems or other sensors the HORN® Rapid Adjust Bracket H-RAB bears the possibility of remote control.  

This new burner bracket offers several advantages for our customers, which can be found HERE

600450 HORN® develops new Burner Bracket H-RAB glassonweb.com

Others also read

How does the RHF-A25/25 work? What are the benefits of a robotic spacer frame mounting system? What is the biggest challenge in this fully automatic frame mounting process? All these questions will be answered in this video.
Eyrise has used liquid crystal technology to provide benefits during the day and at night.
Optimal protection for birds and maximum transparency
Online the video of the new Glass Unloader Art. GU by Forel. This new solution, presented for the first time in 2021 at GlassBuild America and at Vitrum is compatible with every kind of IG line.
Climate protection with windows
Thanks to the good cooperation with PGP Glass, the entire project was realised within the specified time schedule and the new 250 t/d furnace was successfully put into operation at the end of August 2021.
SentryGlas® ionoplast interlayer supports first-of-its-kind building to showcase watchmaking expertise.
For the first time "Night of Technology Bonn" at the manufacturer of film for laminated safety glass on the industrial park in Troisdorf
From Glass to Windows Seamlessly with A+W Clarity & A+W Cantor
Roadmap for a climate-neutral glass industry
Eyrise has scooped five international architecture and design awards for two separate projects undertaken in partnership with architects 3deluxe.
A+W Software Ensemble for Highly Automated Insulating Glass Production in Lithuania

Add new comment

From industry

Am Pfahlgraben 4
35415 Pohlheim
Germany