Aluminium Specified For Regeneration Project

Aluminium Specified For Regeneration Project
Photo source
comar-alu.co.uk
Comar Architectural Aluminium Systems, with their approved fabricator LDG completed the installation of aluminium curtain walling, windows and commercial doors to a new waterfront £8.6million flagship office block and call centre.

Part of the Mersey Waters Enterprise Zone and the 500 acre Wirral Waters regeneration scheme, and built on previously derelict land, The Tower Wharf project saw the design of the 48,000 sq ft 4 storey office building which includes a roof terrace and office accommodation for around 800 staff. 

This project was also the Winner of Best Commercial Building at the ‘RICS’ 2016 Awards and the building achieved the BREEAM ‘Excellent’ rating for sustainability.

Aluminium Specified For Regeneration Project

To maximise natural daylight and facilitate the large glazed areas Comar 6EFT was specified as it offers architects a flexible system, providing a structurally glazed solution, with options for facets, concealed vents and an extensive range of profiles that cater for large structurally glazed panes.  

Comar 6EFT also offers the slimmest silicon or EPDM joints in the industry, which means the eye catching glazed area is maximised. LDG could ensure that this project could be completed within the restraints of the budget.

Complying with the latest CWCT standards Comar 6EFT systems are mullion drained thermally broken structurally glazed curtain walling system with drained capping, pressure equalised and drained is in accordance with BS6262.

Aluminium Specified For Regeneration Project

In a market where energy efficient designs and meeting the demands of the latest Building Regulations are paramount Comar 5P.i Auto Opening Vent, thermally efficient polyamide insulated windows were specified.

These aluminium windows offer outstanding weather performance and reduce heat loss through the trademark P.i thermal break ensuring low U-values so energy bills are minimised.

Comar 7P.i Commercial Door sets were the natural choice for this high traffic head office/call centre building. Comar 7P.i CD door sets can be hung from Comar 6EFT framing and are a natural choice for any busy environment. They are available in swing, pivot, sliding, auto-sliding and sliding folding options.

Architects: Falconer Chester Hall

Fabricator: LDG (Lancashire Double Glazing)

Main Contractor: Eric Wright Construction

Project Value: £1m

Systems Used: Comar 6EFT Toggle, 5P.i  60mm Auto Opening Vents, 7P.i CD

600450 Aluminium Specified For Regeneration Project glassonweb.com

Others also read

Registration for this year's GlassBuild America: The Glass, Window & Door Expo, is now open!
Value Windows and Doors has added a new way for dealers to order its products that is faster, more accurate and costs less.
Wrightstyle has introduced a new door system that provides 90 minutes of integrity and insulation (EI90).
Sawig Office is a modern and fully glazed office building located in Podgórze, a district of Krakow, Poland.
Up to 70% cost savings can be achieved when using ISO-BLOCO ONE high performance foam tape from ISO-CHEMIE to install and seal windows.
Being chosen to take part in an ambitious project on behalf of one of the UK’s leading Art Schools is a true testament to the capabilities of switchable technology from Intelligent Glass.

From industry

NEWS RELATED PRODUCTS

Thermoseal Group Ltd.
Thermoseal Group Ltd.
Wrightstyle Ltd.
Thermoseal Group Ltd.

Add new comment