Senior Process Control Engineer - Tank

4 Mar | Glass jobs opportunities

Since operations began in 1974, the Wichita Falls plant team has been dedicated to quality float glass and coating operations, and have produced glass for some of the most iconic buildings.

At the heart of the Wichita Falls plant are two float glass lines, one of which is oxy-fuel based. The oxy-fuel-based line provides significantly improved energy efficiency and reduced environmental impact. Both lines utilize automatic, camera-based inspection systems that help to ensure product quality and consistency.

The plant currently operates one coating line, and a new jumbo magnetron sputtered vacuum deposition (MSVD) glass coater is currently under construction. Slated to be the largest of its kind in North America, the new coater will be capable of producing glass in standard sizes of 130-by-204 inches, with larger sizes available for special orders.

Vitro Glass and the city of Wichita Falls were recognized for a $1.9 million project that diverts treated non-potable wastewater from the city’s Northside Wastewater Treatment Plant to seven glass-cooling towers operated by Vitro Glass, which has reduced potable water consumption at the facility by more than 50 million gallons per year. The project, which was implemented during extreme drought conditions in 2014 and 2015, included construction of a 1-million-gallon reservoir to store non-potable water on-site, as well as the rerouting of rinse water for a glass coater and washer.

The incumbent would be working in our Tank department. The Tank Department consists of two 650 tons per day capacity tanks operating 24 hours a day, seven days a week. Solargray, Solarbronze, Graylite, Solex, and clear are produced in many thicknesses. Solarcool products are also made. Mixed ingredients are fed from the batch plant into the two tanks and melted in temperature that exceed 2900ºF. The molten glass flows from these tanks into respective baths of molten tin where it floats on the tin surface, thereby creating a ribbon of glass with parallel surfaces and uniform thickness.

The glass is then conveyed to the rolls in the annealing lehr where it is cooled to working temperature. After cooling the glass is delivered to the Wareroom for inspection, cutting, packing and shipping.

This position's responsibilities fall into the category of coordinating and directing production activities of the batch plant, tanks, baths, and lehrs. Making decisions and assuming responsibility for meeting unit goals. On frequent tours of the department, the incumbent has direct contact with the Supervisors, Tank, and other production engineers during which they discuss production activities, quality, process, operating procedures, policy, complaints, and personnel problems.

This position reviews and analyzes the various unit production and quality reports, and takes corrective action as necessary within the established operating parameters and procedures. The incumbent refers serious or unusual circumstances to the Float Process Manager for directions and maintains close communications with the Wareroom, Quality Control, and other staff functions to assure efficient control of operations and to improve performance.

This position makes recommendations to the Float Process Manager regarding new methods, new equipment, organization, and general improvement of the Department and glass quality. Periodically a thorough inspection of the tank refractory structure to determine condition and coordinates the ordering of material, supplies and equipment used in the unit. Major items or new items are directed to the Float Process Manager for approval.

The incumbent keeps abreast of technological improvements to the process through contact with VITRO Research and other VITRO Tank facilities, exercises engineering skills and basic knowledge of the process and related equipment to determine those areas of least efficient operation and those most penalizing to quality. As a result, he develops new methods or changes to equipment which leads to general improvement in the operation.

The incumbent helps coordinate, as needed, the efficient scheduling of manpower within the assigned area of the unit and administers a positive training and safety program to assure maximum performance. This position, as part of the Works #4 philosophy, will create an atmosphere of confidence, mutual trust and respect with the tank employees.


Job Requirements

The incumbent must have a B.S. degree in ceramic or chemical engineering and a minimum of two years experience in production or process engineering. General knowledge of float glass batch, melting and forming processes also is necessary. The incumbent must have demonstrated leadership, judgment, administrative ability, and be alert and flexible to group details and use in making decisions in the face of rapidly changing conditions.

To apply, please visit VitroCareers.com

Vitro Architectural Glass
7400 Central Freeway North
76305 Wichita Falls
United States