GlassOnWeb.com - Glass News - PCL Centennial Learning Centre Incorporates Super Spacer® Into LEED® Gold Design
 
 HOME   DIRECTORY   NEWS   ARTICLES   BUSINESS AREA   FORUM    JOBS  
 
Sign-in | Registration
  »  Home  »  News  »  PCL Centennial Learning Centre Incorporates Super Spacer® Into LEED® Gold Design
 
SJ Software GmbH
 
   CONTRIBUTE
Submit your news
Submitted news

   NEWS ARCHIVES
2010
July
June
May
April
March
February
January
2009
2008
2007
2006
2005
2004
2003
2002
2001




GLASS ON WEB - news feed
 
  News


Companies
PCL Centennial Learning Centre Incorporates Super Spacer® Into LEED® Gold Design

Leading construction company builds sustainable headquarters in Edmonton, Alberta

Any company’s headquarters is an important reflection of its culture and reputation in the marketplace. But imagine being one of the largest, most respected building contractors in North America. Your corporate headquarters is more than just a building; it’s a part of your portfolio.

With its 100-year anniversary in sight, Edmonton, Alberta-based PCL felt the construction of its new headquarters would be a perfect way to celebrate the company’s vast success and dedication to building high-quality, sustainable structures. The plans were magnificent, incorporating the latest and greatest materials in the building and construction industry to link two existing structures on the company’s 3.3-acre campus.

Cohos Evamy integrate design was awarded the honor of designing PCL’s new headquarters, aptly named “PCL Centennial Learning Centre (CLC).”

It was PCL’s vision to create a state-of-the-art structure that would achieve Leadership in Energy and Environmental Design (LEED®) Gold certification.

“This was a unique opportunity to create a masterful work of energy efficiency and sustainability for one of the most well-respected building contractors around,” said Keith Robinson, lead specification writer and building envelope specialist for Cohos Evamy.

“We chose only the best materials, including Super Spacer® in all the window systems.” The PCL CLC design incorporated approximately 18,000 square feet of glass, accounting for 60 percent of the building’s exterior walls.

“The use of glass in a project such as this is not only aesthetically pleasing, but can also benefit our efforts to save energy,” Robinson said. “Harvesting natural daylight serves to reduce lighting costs, but to make this possible, you have to know that your window systems are going to provide optimal thermal performance and durability.” When specifying the spacer system, the Cohos Evamy team looked at a few different systems before choosing Super Spacer. Decision factors included condensation resistance, energy efficiency, wind resistance, structural strength and long-term durability/sustainability.

“Super Spacer was chosen because it embodies these attributes and is a known contributor to LEED certification,” Robinson added. “We regularly specify Super Spacer in our projects and have been pleased with Edgetech’s ability to provide data that we can easily input into our modeling system.”

The building was completed in June 2006 in time for PCL’s 100th anniversary celebration. With the thoughtful planning that went into the project, the design and building team were able to achieve the coveted LEED Gold certification.

 It was the first private-sector building in Alberta to accomplish this. PCL attributes the success of the building in many ways: Lowered consumption of resources resulted in lower operating costs.

The design incorporated a sustainable agenda without adding a premium to the original budget. Engineered systems were integrated into the building, adding to the overall look and design.

The pride of achieving LEED Gold certification. The structure houses state-of-the-art training rooms,boardrooms, meeting rooms, human resource and professional development offices, as well as a staff lunchroom and assembly hall overlooking beautifully landscaped gardens.

For more information visit www.cohos-evamy.com.


May 22nd, 2009
Source: Edgetech I.G. Inc.


Print this article  Printer friendly version Send this article to a friend  Send to a Friend


Share on :   facebook  twitter  google  yahoo  linkedin  delicious  digg  mixx  stumbleupon   email



Add a Comment

You have to be registered in order to add your comment.
If you already have an account, please sign-in to comment.




Latest news
Jul-30-10
Edgetech I.G. ‘ProActive’ About Health and Wellness
Jul-30-10
Vitrealspecchi at glasstec 2010
Jul-30-10
PPG publishes CLARVISTA shower glass white paper
Jul-30-10
The appearance and development of LED glass
Jul-30-10
Alcor 100
Jul-29-10
Strong Italian Presence at Glasstec 2010: 13,000 Square Meters Reserved for Made in Italy
Jul-29-10
Flat Glass Rooflights
Jul-29-10
Security Breach At Smart-Builder Head Office, Pre-Release Images Leaked
Jul-29-10
Law Volvo Car Corp. Sues Nippon Unit In U.K. Over Price Fixing Of Car Glass
Jul-29-10
Pilkington To Create 130 Jobs As Global Demand Returns




ADVERTISING