GlassOnWeb.com - Glass News - OAG secures glazing package at world renowned LSE
 
 HOME   DIRECTORY   NEWS   ARTICLES   BUSINESS AREA   FORUM    JOBS  
 
Sign-in | Registration
  »  Home  »  News  »  OAG secures glazing package at world renowned LSE
 
 
   CONTRIBUTE
Submit your news
Submitted news

   NEWS ARCHIVES
2013
May
April
March
February
January
2012
2011
2010
2009
2008
2007
2006
2005
2004
2003
2002
2001



GLASS ON WEB - news feed
 
  News


Architecture
OAG secures glazing package at world renowned LSE

OAG will design and install two structurally glazed facades to the reception area of Tower One building. The work will also include the installation of two revolving doors and other entrances.

Scope of works

As of early April 2012 the Estates Division will commence works on site for the refurbishment of the existing reception areas to Towers 1 & 2. The works are being implemented to substantially enhance the quality of and accessibility to the reception areas of the Tower 1 & 2 buildings. The new reception will be an enlarged reception space which joins the two existing separate entrances in to one new joint reception area. The new joint reception will be achieved by removing the rather unsightly existing loading bay and existing reception £5m refurbishment to the teaching and office space within Tower 1.

The new enhanced reception area will incorporate.

  • Enhanced access into the new joint reception area to better facilitate the numbers of students, staff and visitors requiring access to Towers 1 & 2 on a daily and hourly cycle.
  • Improved security and access control to the buildings through the installation of turnstile barriers and a manned security reception desk.
  • Glazed one-to-one meeting room facilities for use by the building occupants.
  • Disabled toilet facilities.
  • Dynamic and interactive advertising and display areas for use by the building occupants to promote information about their departments to the school and the public.
  • A fully glazed and clad frontage to the new reception area to open the new reception area up to better levels of natural day lighting.
  • A new internal café.
  • Public realm improvements to Clements Inn Passage including a new road surface, lighting and seating areas.
  • Upgraded disabled access including a new disabled platform lift.



June 18th, 2012
Photo: www.oag.uk.com
Source: www.oag.uk.com


Print this article  Printer friendly version Send this article to a friend  Send to a Friend


Share on :   facebook  twitter  google  yahoo  linkedin  delicious  digg  mixx  stumbleupon   email



Add a Comment

You have to be registered in order to add your comment.
If you already have an account, please sign-in to comment.




Latest news
May-23-13
Guardian Industries Introduces Reveal: Glass Innovation for Both Light and Privacy
May-23-13
Innovations from Fenzi at China Glass 2013
May-23-13
Glassolutions pioneers innovative route to unlock ECO and Green Deal funding
May-23-13
Delegation of Chinese Architects, Dip-Tech, Kfar Saba
May-23-13
StekloSouz invites to visit an exhibition ChinaGlass-2013
May-23-13
Heye Brings NNPB to China
May-23-13
New Report on Global Automotive Glass Manufacturers
May-23-13
Glass Doctor of North Texas Celebrates 10-Year Anniversary
May-23-13
New generation Pyrotape
May-23-13
RHI confirms full-year guidance with Q1 results (ad hoc)






ADVERTISING

The emissions produced by our servers are offset by renewable energy projects that reduce the use of fossil fuels. These projects are verified by The Voluntary Carbon Standard.